ECLIPSE
Collaborative lunar systems engineering
Digital Engineering Ecosystem
S24 DEE β€” Digital Engineering Ecosystem
1. Build Requirements
2. Mission Network Activation
Activate Systems (Note: Dummy Elements Displayed for Demo Only)
Active Systems
5
Assets currently available to the DES
Network Edges
8
Potential operational interactions
Feasible Plans
3
Dummy DES outputs ready for screening
Placeholder
78
Placeholder
Mission Operations Graph
Active node Power flow LOX flow
Graph updates when systems are turned on or off. This is the stakeholder-facing systems view that constrains what the DES is allowed to sequence downstream.
3. Model Submission
Modules
Run Graph first.
No file File ready Uploading Uploaded 3D preview ready
Part Metadata
Select a module on the left.
πŸ“¦
Drag & drop a USD/USDA/USDC/USDZ file here
or click to browse
No CAD file loaded yet.
SysML Metadata
Material
Units
Actions
4. Mission Tradespace Selection (DES)
Configure active nodes and parameters, then run the Discrete Event Simulation.
Active DES Nodes
Simulation Parameters
# Regolith Rovers1
# ISRU Plants1
Regolith Haul Distance (km)1.0
LOX Haul Distance (km)1.0
Rover Energy (kWh/km/kg)0.00034
Rover Travel Time (hr/km)5
ISRU Processing Rate (kg/hr)1600
LOX Transport Threshold (kg)100
Run the DES simulation to see results here.
5. Simulator