Run Graph first to load modules from SysML. You can then toggle which ones to activate.
Mission Operations Graph
Active nodePower flowLOX flow
Graph updates when systems are turned on or off. This is the stakeholder-facing systems view that constrains what the DES is allowed to sequence downstream.
3. Model Submission
Modules
Run Graph first.
No fileFile readyUploadingUploaded3D preview ready
Part Metadata
Select a module on the left.
π¦
Drag & drop a USD/USDA/USDC/USDZ file here
or click to browse
No CAD file loaded yet.
SysML Metadata
Material
Material Properties
Units
Actions
β Metadata saved and CAD file uploaded to repo.
4. Urban Planning β Site Selection & Module Placement
Lunar South Pole Β· Scroll to zoom Β· Drag to pan Β· Click a pin to select
Image: NASA LRO LOLA Β· Data: Jenny Zheng (GT) / NASA SDT / Artemis III studies
β₯80%β₯75%<75%
Score:
Click a site pin to see detailed analysis.
β Selected:
Module placement heatmaps coming soon.
Complete Step 4.1 first.
5. Mission Tradespace Selection (DES)
Mission Time
t = 0 hr
Parameter Controls
Stakeholder changes the assumptions here.
# of regolith rovers1
Parallel haul capacity to regolith loop.
# of ISRU plants1
Parallel processing units, shared infrastructure.
Regolith haul distance1.0 km
Excavation site β ISRU plant distance.
LOX haul distance1.0 km
ISRU plant β landing zone distance.
Rover energy (kWh/km/kg)0.00034
Primary driver for regolith availability.
Rover travel time5 hr/km
Longer travel delays delivery cadence.
ISRU processing rate1600 kg/hr
Higher rate increases LOX output.
LOX transport threshold100 kg
Triggers LOX rover pickup.
Coupled Mission State Network
Node color = health/utilization. Edge thickness = current flow magnitude.
Downstream Consequences
If I change one operational knob, what else changes?